SLS Universal Stage Adaptor Pre-work Meeting

Map Unavailable

Date/Time
Date(s) - 03/03/2015
12:00 AM - 2:00 PM

Location
1209 rm 185

Category(ies)


Attendees:

Bob Fairbairn – cost

Bonnie Lahiff – schedule, handing off to Bill later

Brian Stewart, Chauncey Wu – manufacturing

Mark Hilburger – lead engineer, but will have an alternate during session

David Sleight – composites design

Tim Collins/Dave Paddock – human architecture assessment tools

Zoran Martinovic – mechanical design (not attending session)

Larry Huebner – Marshall involvement

Glenn Hines and Jim Price – SE branch

Discussion

Next steps for project? That’s part of what we’ll figure out in session.

Anticipating cargo flights. Being proactive to have Langley innovation to meet this need, with partners.

Fill in gaps for SLS to get to Mars Evolvable Architecture needs.

MEL for USA to use to analyze new concept – Tim and Dave can use their tools

Trade study from September (USA slides) – 4 fairings. Which one will get you to 40 metric tons to lunar orbit.

We want one concept (and accompanying partnering needs to develop, next steps) that improves on those chosen, using Langley strengths.

Brainstorming areas: open constraints put on trade, how to deploy, nosecone design, etc. improvements, Co-manifested or stand-alone?

May only find areas to look into, but not able to create a different concept. – Define decision point during session

Team roles and Deliverables updated on OneNote

Pre-work

Zoran get drawings to team

Bob and Bonnie Use SLS output to get a draft cost and schedule to start:

Co-manifested concept: Orion and hab below

Europa

Samantha Final working agenda onto OneNote

Kerry Tailor OneNote structure and names to project; load reference slides into Background Section as able

Jose Set up Systems section as desired for interface definition, and potential MEL (in OneNote or linked SIE workbook)